Projects

Northwest Greenway Boardwalk

Client City of Plymouth
Location
Plymouth, MN
Completion Date Fall 2018
Value $875,000
Services Performed
Parks & Recreational Trails

Northwest Greenway Boardwalk

As an integral part of the Northwest Greenway Development, this boardwalk connects  Wayzata  Senior High School to the  larger trail system in Plymouth, Minnesota. The boardwalk runs 10 feet above ground  and  stretches  840 linear feet across marshland. At 12 feet wide, and rated up  to a 10 ton load capacity, this heavy-duty timber structure can fully support pedestrian traffic as well as emergency vehicles. Additional features included in this boardwalk installation project are a platform lookout, an overhead pergola structure, and  IPE  benches.  If you're in the area, take some time to check out this unique boardwalk trail system.