Mahtomedi Pavement Reconstruction

Location
Mahtomedi, MN
Completion Date
Fall 2017
Value
$2,900,000
Services Performed

Mahtomedi Pavement Reconstruction

The Mahtomedi High School and Middle School reside within the same site sharing access drives and parking lots. The shared lots and drive lanes were in poor condition, in need of repair, and requiring new storm sewer infrastructure. Additionally, due to high traffic volume, the lots had two unsafe access points. As part of this project, one access point was eliminated and the other was increased in size including the addition of a traffic light. The greatest challenge in completing this project was the timeframe in which it needed to be finished. We only had 68 days to complete the work while the school was on summer break. Although many unforeseen obstacles were encountered, our crews worked long hours and weekends to meet the construction schedule. The following items are just a few of the undertakings that were completed by Peterson Companies:

  • Construction of 6 acres of parking lots and drive lanes
  • Export of over 45,000 CY of existing soils from the site
  • Import of over 35,000 tons of sand for parking lot soil correction
  • Installation of over 60 concrete structures including 8,400 feet of storm drainage piping and two underground stormwater chamber systems
  • Over 3 acres of sod restoration

Watch the construction process.

See the finished product.

Want to see what we can do for you?

Get Started